Final Reports posted:
- 8/21/20 MNM – Limestone – Machinery Updated (11/30/20)
Fatalities awaiting Fatality Alert to be posted:
- 10/27/20 Coal – Fall of Roof or Back
- 11/8/20 MNM – Machinery
- 11/23/20 Coal – Powered Haulage
- 11/23/20 MNM – Electrical
Fatalities awaiting Final Report to be posted:
- 7/24/20 MNM – Machinery
- 9/1/20 MNM – Slip or Fall of Person
- 9/16/20 MNM – Powered Haulage
- 10/9/20 Coal – Machinery
- 10/13/20 Coal – Powered Haulage
- 10/14/20 MNM – Powered Haulage
- 10/19/20 MNM – Machinery