Final Reports posted:
- 1/22/21 Coal – Powered Haulage
- 2/8/21 MNM – Powered Haulage
Fatalities awaiting Fatality Alert to be posted:
- 7/26/21 MNM – Slip or Fall of Person
- 7/28/21 MNM – Falling or Sliding Material
Fatalities awaiting Final Report to be posted:
- 11/23/20 MNM – Electrical
- 12/14/20 MNM (2) – Fall of Roof or Back
- 1/22/21 Coal – Powered Haulage
- 2/22/21 MNM – Powered Haulage
- 3/12/21 MNM – Handling Material
- 4/19/21 MNM – Powered Haulage
- 4/22/21 MNM – Powered Haulage
- 5/14/21 Coal – Fall of Roof or Back
- 5/18/21 Coal – Machinery
- 6/2/21 Coal – Fall of Face, Rib, Side, or Highwall
- 6/3/21 Coal – Powered Haulage
- 6/7/21 MNM – Handling Material
- 6/9/21 Coal – Powered Haulage
- 7/13/21 MNM – Fall of Roof or Back
- 7/21/21 Coal – Machinery